home > case studies > full office fit-out for London based client
Office Design Case Study - Full Office-Fit for Leader in Full-Service Engineering, Construction & Operations
Our London based client, a global leader in full-service engineering, construction, and operations into office space at The Point, Paddington, undergoing a full office fit-out covering 8,862 sq. ft.
Saracen Office Interiors tendered for the work and won the opportunity to completely fit-out the office shell with designs and space planning tailored to meet the client’s requirements.

The office refurbishment / fit-out included:
-
Dilapidations
-
Partitioning
Internal decoration
Suspended ceiling
Floor finish
Lighting
Power and data
Kitchens


Break out areas
Air conditioning
Manifestation/glass etching

-
Audio door entry systems
-
Toilets
Adaptation to existing rooms and facilities
Fire protection
Audio visual equipment
Relocation of current furniture from other offices
Provision of additional furniture and fittings.

Saracen continues to maintain and service the office space to evolve with the client’s needs.